We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Polyurethane resin filler material.
ipros is IPROS GMS ・ IPROS One of the largest technical database sites in Japan that collects information on.

Polyurethane resin filler material - List of Manufacturers, Suppliers, Companies and Products | IPROS GMS

Polyurethane resin filler material Product List

1~2 item / All 2 items

Displayed results

[Construction Case] Nursing Facility South Building: Underfloor Void (Cavity) Filling Work

Due to weak ground, ground subsidence! Only the ground is sinking, creating gaps under various floors inside the building.

We would like to introduce a case of "subfloor void filling work" conducted at a nursing care facility located in Shizuoka Prefecture. Due to weak ground, ground subsidence had occurred, causing the ground to sink while voids were observed under various areas of the floor within the building. We performed filling work using polyurethane resin to fill the voids beneath the floor slab, successfully eliminating the voids. 【Case Overview】 ■ Construction Area: Approximately 250m2 ■ Location: Nursing care facility in Shizuoka Prefecture ■ Construction Period: 3 days *For detailed information about the case, please refer to the related links. For more details, please check the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Electric Company Substation: Void (Cavity) Filling Work

The foamed polyurethane resin compressively strengthens the ground! It suppresses the occurrence of voids, cavities, and gaps after construction.

We would like to introduce a case of "void (cavity) filling work" carried out at a power company substation in Hokkaido. During the renovation work of the building, voids were observed under the concrete floor, leading to a request for void (cavity) filling to prevent issues before installing heavy machinery. The polyurethane resin injection work was carried out while confirming the height with a laser level, and it was confirmed that the polyurethane resin was densely filled, completing the construction. 【Case Overview】 ■ Construction Area: 57m2 ■ Maximum Void Size: 100mm ■ Area: Hokkaido / Power Company Substation ■ Construction Period: 1 day *For more detailed information about the case, please refer to the related links. For more details, please check the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration